As some of the F1006B Bulkhead holes have been enlarged four rivets fastening F1006A and F1006C to F1006B didn't look good enough. For this reasons together with Lucio we resolved to drill them out, to prepare two doublers and to rivet the doubler to the F1006 assembly.
It took some time, but at the end the result is very good.
In addition we also countersunk the 6 rivet holes along the baggage door triangle. We also set the rivets according to the plan.
We also identified a missing dimple that we fixed with the Hammer/Bucking bar tool prepared few days ago.